Monica Acunia (Eastwood)
3966 Alpine Aster
San Antonio, TX 78259
775-846-8668
macunia@aol.com
Summary
I have over 17 years of experience in Commercial, Residential,
Industrial, Healthcare Facility, Federal and Highway Construction.
Working with Local City, County, State and Federal Officials (Naval Facilities Engineering Command, Air Force Civil Engineering
Center, US Army Corps of Engineers, Texas Department of Transportation and many more). My experience includes, but is not limited
to:
• Assists in proposal review and preparation; over 8 years’ experience preparing and maintaining schedules; preparing, submitting
and reviewing submittals, change orders, work authorizations, purchase orders; small business reporting; preparing and
submitting Operation Maintenance Manuals; Assistant Project Manager; preparing and submitting monthly invoices.
• Building & Maintaining Program and Project (Design/Construction) Schedules. P6/Microsoft Project
Work Experience
Sr. CPM Claims Analyst at HNTB, San Antonio, TX
May 2014 - Present (7 months)
Responsibilities included, but are not limited to: Implementing an office wide work plan for the South-Central Texas Division, utilizing Primavera P6.
Preparing individual Project Work Plans, including constructions schedules. Review Subcontractor Implementation Schedules, verifying logic, costs,
and that contract requirements have been met. Work closely with Department Leads, Project Managers and Engineers preparing Implementation
Schedules and Work Plans for Highway, Bridge and Design Build Projects. Utilizing Primavera P6 and Microsoft Project scheduling software.
Project Controls - Scheduler at URS Corporation (Federal Programs Department), San Antonio, TX
July 2011 - May 2014 (2 years 11 months)
Responsibilities included, but were not limited to: Built and maintained multiple project schedules, consecutively. From Program development,
environmental and public input, through all phases of design, construction, to close-out. Many are required to be resource and cost loaded. The
schedules that I built and maintained were for various Government agencies. The schedules were maintained weekly, Bi-weekly and monthly
according to client specifications. I worked closely with Engineers, Designers, Project Managers and Superintendents, to ensure that the
schedules gave an accurate representation of the project and scope of work to be performed. Utilizing Primavera P6 and Microsoft Project scheduling
software.
Office Manager at Parsons, San Antonio, TX
November 2010 - April 2011 (6 months)
Responsibilities included, but were not limited to: Research various Air Force Bases for proposal purposes; Cost impacts, last site renovation, individual
base needs. Performed Office Manager duties, along with various administrative tasks.
Document Control/Project Administrator at Brandt Engineering, San Antonio, TX
June 2009 - November 2010 (1 year 6 months)
Responsibilities included, but were not limited to: Document Control for the San Antonio Military Medical Center. Prepared Daily Reports, RFI’s, RFP’s,
Assisted Quality Control in Submittal Preparation and Review. Updated As-Built Drawings. Reviewed and updated project schedule. Managed
Operations Warehouse, along with performing administrative tasks. Team Leader
Document Control/Project Administrator at RHP Mechanical, Reno, NV
August 2008 - April 2009 (9 months)
Responsibilities included, but were not limited to: Compile and prepare required documentation for Submittals and Closing O&Ms. I would assist
customers in their understanding and use of Primavera Construction. I would assist in preparing schedules for upcoming projects, while also cost
loading and man-loading schedules.
Office Manager at Highland Mechanical Contractors, Inc., Reno, NV
March 2007 - August 2008 (1 year 6 months).
Responsibilities included, but were not limited to: Preparing proposals, submittals, O&M material, and preparing closing documents.
Performed Office Manager Duties: Payroll, Certified Payroll, A/R, A/P.
Office Manager/Sales/Assistant Project Manager at B & C Mechanical Insulation Contractor, Reno, NV
August 1997 - August 2007 (10 years 1 month)
Responsibilities included, but were not limited to:
Manager. Office Manager Duties, including Material Sales and various administrative tasks.
Preparing proposals, including estimating material/labor, schedules, Assistant Project